
The short answer
Wind mitigation in Hollywood, FL means strengthening the parts of a house that hurricanes break first: the windows and doors, the roof covering and the water barrier under it, the nailing of the roof deck and the connection between the roof and the walls. Protect every glazed opening, save the roof work for the next reroof, use products approved for the High-Velocity Hurricane Zone under a City of Hollywood permit, and book a new inspection once the permit is closed.
Key points
- Opening protection changes the form only when every window, door, skylight and garage door with glass is covered.
- A reroof is the one chance to add a sealed roof deck and stronger deck nailing, and on some older homes the code adds roof-to-wall work.
- All of Broward is in the HVHZ: ask for a Miami-Dade NOA or a Florida Product Approval that covers HVHZ use, and expect a city permit.
- Condo owners install protection under the board's hurricane protection specifications, which Florida law requires every condominium board to adopt.
- Nothing reaches your policy until the permit is closed and a new wind mitigation form documents the work.
In this article 15 sections
- Wind mitigation in Hollywood, FL: what upgrading a home really means
- Which wind mitigation upgrades come first in Hollywood?
- Hurricane protection priorities for each kind of Hollywood home
- Impact windows and hurricane shutters in Hollywood, FL
- Hurricane retrofit during a reroof: deck, water barrier and straps
- HVHZ product approval: what a Hollywood product needs
- City of Hollywood building permits for windows, shutters, doors and roofs
- Condos, townhomes and HOAs: hurricane protection under the board's rules
- Keeping documents: the file that turns upgrades into form answers
- When to book a new wind mitigation inspection after upgrades
- My Safe Florida Home, city programs and asking your insurer first
- After a hurricane: repairs, damaged openings and the Z answer
- Wind mitigation upgrade myths Hollywood homeowners run into
- Hurricane upgrades beyond Hollywood
- The bottom line
Wind mitigation in Hollywood, FL: what upgrading a home really means
Wind mitigation in Hollywood, Florida is less about one product and more about closing weak points in a sensible order. Hurricanes test the same places on house after house: glass that breaks and lets the wind inside, garage doors that buckle, roof coverings that peel, roof sheathing that lifts and roof framing that pulls away from the walls. Every upgrade in this guide closes one of those gaps, and most of them can also change an answer on Florida's wind mitigation form, OIR-B1-1802, which is how your insurer finds out about them.
The age of the city's housing is the reason this matters so much here. In the Census Bureau's American Community Survey for 2020 to 2024, the median year built for Hollywood's housing units is 1969. That puts the typical house decades ahead of the post-Andrew changes to the South Florida Building Code in 1994 and the statewide Florida Building Code of 2002. Many of those homes have been improved since, one project at a time, which is why so many of them end up with a mix of protected and unprotected features.
This is the practical guide: what to do first, how the work differs by type of home, which approvals and City of Hollywood permits apply, and how to make sure the result reaches your policy. If you want the concept itself in plain language, start with what wind mitigation means and why Florida credits it. If you mainly want to know what your house already has, our page on wind mitigation inspections in Hollywood explains the visit and how to book it.
Which wind mitigation upgrades come first in Hollywood?
Start from the gaps, not from the catalog. A house with impact windows and an old garage door needs a garage door, not more windows. A house with a twenty-year-old roof should plan its roof items around the reroof that is coming anyway. The table puts the common upgrades in a reasonable order for most Hollywood homes and shows which item of the form each one can change and whether the city expects a permit.
| Upgrade | What it protects | Form item it can change | City of Hollywood permit |
|---|---|---|---|
| Protection for every unprotected glazed opening (impact windows, impact doors or approved shutters) | Glass that breaks and lets wind and rain inside the house | 9, Opening Protection | Yes, for windows, doors and shutters, with product approvals |
| Impact-rated garage door | The widest opening on most houses | 9: a door with glass sets the letter, a solid door the sub-level | Yes, with product approval |
| Impact-rated skylights, or closing old skylights | Glazing set into the roof | 9, Opening Protection | Yes; ask whether it is covered by the roofing permit |
| New roof covering with a product approval | Shingles, tiles or panels blowing off | 4, Roof Covering | Yes: roof permit plus the HVHZ permit application for roofs |
| Sealed roof deck (secondary water resistance) | Rain pouring through the deck seams if the covering is lost | 8, Sealed Roof Deck / SWR | Part of the reroof permit |
| Renailing the roof deck | Sheathing lifting off the trusses | 5, Roof Deck Attachment | Part of the reroof permit |
| Roof-to-wall connectors | The roof framing pulling away from the walls | 6, Roof to Wall Attachment | Yes; during a reroof it may be part of that job |
| Gable end bracing | The tall triangle of wall at a gable end | No item of its own | Ask the Building Division; it is structural work |
| Repairing damaged windows and doors | Openings that no longer close, latch or hold | 9, the new Z answer for damaged openings | Yes for a major repair of a window or door |
Three rules explain the order. First, openings can be done at any time and they protect the inside of the house, so they usually come first. Second, the roof covering, the deck nailing and the sealed deck can only be reached when the old covering comes off, so they belong to the reroof, whenever it falls. Third, roof-to-wall connectors sit in between: they can be retrofitted from the attic or the eaves, but the work is far easier while the roof is open.
Some useful work changes no answer at all. Bracing a gable end wall, for example, has no item of its own on the form, but it strengthens one of the most exposed parts of a gable-roofed house. Decide what you are paying for: protection, documentation, or both. Before spending, ask your agent how your insurer would treat a specific change. Since October 1, 2023, Florida insurers have had to describe their hurricane mitigation discounts on their own websites, which gives you something concrete to ask about.
Hurricane protection priorities for each kind of Hollywood home
Hollywood grew in layers, and each layer left a different set of gaps. The year built is only a starting point, because five or six decades of remodeling can change almost anything, but it does tell you where to look first.
Homes01
1920s to 1940s homes near downtown and Hollywood Lakes
The city was founded during the land boom of the 1920s, and its oldest houses sit around downtown and in the Lakes section. Many have barrel tile, flat roofs behind parapets, wood casement or awning windows, French doors and odd-sized openings added over the years. Flat roofs often leave little or no attic to enter, so the deck and roof-to-wall items may never be verifiable from inside.
Openings come first here, and custom sizes are common, so get the product approval for every unit before you order. Plan the roof items for the reroof, when the deck and the tops of the walls can be seen and photographed. If the house is a designated historic site or sits in one of the city's historic districts, exterior changes may need design review before the building permit, so start that conversation early.
- Start with
- Every glazed opening, then the reroof
- Watch for
- No attic access, unpermitted flat roof sections, historic review
Homes02
1950s to 1970s block ranch homes
This is most of Hollywood: concrete block and stucco ranches in Hollywood Hills, Driftwood, Boulevard Heights, Emerald Hills and the streets around them. The original jalousie or aluminum windows have usually been replaced in stages, carports have been closed in, and Florida rooms often carry a low-slope roof of their own. The garage door, if there still is one, is frequently the original light-gauge door with no rating.
The order that tends to work: finish the openings, including the garage door and the small windows nobody thinks about, and then use the next reroof to add a sealed deck, renail the deck and, where the code calls for it, improve the roof-to-wall connections. Do not forget the flat roof over the addition when you get roofing bids. An old section with no permit can hold the whole roof covering item down.
- Start with
- Garage door and any unprotected window
- Watch for
- Enclosed carports, gable ends, roof sections left out of the last reroof
Homes03
1980s to early 2000s homes in the western neighborhoods
Newer subdivisions farther west were built under stricter rules, and houses permitted after the 1994 code changes in Broward were required to protect their glazed openings. In practice that often means removable panels stored in the garage. Twenty or thirty years later, panels go missing, wing nuts and sill anchors disappear, and nobody remembers which panel fits which window. The tile roofs that came with these houses are also reaching the age where a reroof is on the calendar.
Begin with an inventory: count the panels against the openings, check the anchors, and find the permits. Missing pieces are usually cheaper to replace than the whole system, and the paperwork turns existing protection into a documented answer. Then plan the reroof with the secondary water barrier in mind, because the underlayment choice on a tile roof decides whether the form can credit it.
- Start with
- Shutter panels, hardware and permits
- Watch for
- Replacement doors or windows installed without approval
Homes04
Condos, townhomes and villas
From the towers on Hollywood Beach to the low-rise buildings along the Intracoastal and the townhome communities inland, the association controls most of what the form asks about: the roof, the deck and the walls. What a unit owner usually controls is the glass: windows, sliding doors and the entry door, installed under the board's rules. That part of the job is covered in its own section below.
- Start with
- The board's hurricane protection specifications
- Watch for
- Height above 30 feet, which changes the engineering the city asks for

Impact windows and hurricane shutters in Hollywood, FL
For most owners, hurricane protection comes down to one decision: replace the glass with impact-rated windows and doors, or cover the existing glass with shutters. Both are legitimate. On the form, an approved shutter system is worth the same answer as an approved impact window, as long as every glazed opening is covered and the products can be verified.
Impact windows or hurricane shutters?
Impact glass is always in place. Nobody has to climb a ladder, find the right panel or be in town when a storm turns toward Broward, which matters to owners who travel in the summer and to anyone who cannot lift a steel panel. Shutters leave your existing windows in service, and accordion and roll-down systems close in minutes when someone is home to close them. Near the beach and the Intracoastal, salt air works on shutter tracks, rollers and anchors, so whichever you choose, plan on a yearly rinse and a check of the hardware.
The garage door
The garage door is the biggest single opening on most houses and the one most often skipped. A door with a row of windows is a glazed opening, so an unrated one sets the letter for the whole house. A solid door affects the sub-level next to the letter. Replacement doors come with their own approval, label and installation drawing, and the installation has to match that drawing to count as tested.
Finishing the job
Because the form grades the weakest glazed opening, a project that stops one window short changes nothing on paper. Before you sign, walk the house with the contractor and list every opening by location, including the transom over the front door, the bathroom window, the side door into the garage and any skylight. Our guide to how impact windows, shutters and garage doors are graded explains each level in detail. If you plan to split the work across years, ask the Building Division how the code treats the openings you are not replacing yet, because the scope of a window job can carry its own protection requirements.

Hurricane retrofit during a reroof: deck, water barrier and straps
Three of the most valuable items on the form sit under the roof covering, and the only practical moment to improve them is when the covering comes off. Because most Hollywood homes were permitted before the Florida Building Code took effect in March 2002, a reroof of a house with a wood roof deck generally brings code requirements for renailing the deck and adding a secondary water barrier. For some higher-value homes, the code also calls for improving the roof-to-wall connections within a cost limit. Our guide to what a new roof changes on the wind mitigation form walks through those rules and the questions to ask your roofer.
What to settle before you sign
The details that decide the form are easy to lose once the job is finished, so write them into the contract. Ask for a full tear-off of every roof section, including the flat roof over the Florida room or the old carport. Ask which underlayment method will be used and whether it matches one of the sealed roof deck methods the form accepts, because standard underlayment and hot-mopped felt do not qualify. Ask for the nail type and spacing used to refasten the deck, and for the product approval numbers of the covering and the underlayment.
Roof-to-wall connectors and gable ends
Roof-to-wall work is the upgrade most likely to disappoint if it is not planned for the form. Item 6 is graded by the weakest connection the inspector can verify, so a retrofit limited to a few corners can leave the answer exactly where it was. Retrofit connectors are credited by their tested capacity when they are installed to the manufacturer's instructions with site-specific documentation, so ask for that paperwork before the work starts. Our deep dive on hurricane straps, clips and wraps shows what each connection looks like in the attic. Gable bracing has no answer of its own, but on a gable-roofed ranch it is often worth doing while the roof is open.
When the roof is not due yet
If you are not sure whether the roof has years left, a roof condition inspection answers that before you spend anything. The 2026 form also recognizes spray foam applied from the attic, along the rafter and deck intersections and every panel joint, both as a deck attachment answer and as a secondary water resistance method, when it meets the form's definitions. Ask the installer to document the product and the coverage, and ask your insurer whether it has its own view on foamed attics.

HVHZ product approval: what a Hollywood product needs
The Florida Building Code applies its High-Velocity Hurricane Zone provisions to Broward and Miami-Dade counties only, so every opening product and roof system installed in Hollywood is held to the strictest approval rules in the state. In practice, the product needs one of two documents: a Miami-Dade Notice of Acceptance (NOA), which is written for HVHZ use, or a Florida Product Approval with an FL number whose approval documents state that the product is rated for use in the HVHZ. A product approved only for use outside the zone may be fine in Palm Beach County and still be the wrong product for a Hollywood permit.
The city's own checklists put the approvals at the center of the application. For windows, doors and shutters, Hollywood asks for the current NOA or Florida Product Approval for each product being installed, with the elements that apply identified by a circle or a cloud, and for a floor plan that numbers each opening to match a window and door schedule. For buildings with a mean roof height above 30 feet, the city asks for site-specific design wind loads for components and cladding, signed and sealed by a design professional. For lower buildings, its window checklist allows the Broward County voluntary fenestration wind load chart instead.
Three questions keep you out of trouble when you compare quotes:
- What is the approval number for each product, and does it cover HVHZ use?
- Is the impact rating a large missile rating, which the form needs for its top answers, or a small missile rating meant for upper floors?
- Will the installation, including the anchors and the substrate, follow the approval's drawings, and will I receive a copy of the full approval?
Leave every permanent label and etched mark on the glass and frames after the install. On a wind mitigation visit, the label and the permit together are the quickest proof that an opening is what the paperwork says it is.
City of Hollywood building permits for windows, shutters, doors and roofs
The city's building FAQ describes a permit as required for work to construct, enlarge, alter, repair, move, remove or demolish any building or structure, or any part of one. Its checklists apply that directly to hurricane upgrades: the installation, replacement or major repair of a window or door requires a building permit, shutters have their own checklist, and roofing needs a roof permit along with an HVHZ permit application for roofs. In almost every case, the licensed contractor doing the work is the one who applies.
The way applications are filed has changed. Since August 4, 2026, the city has taken all new permit applications through its Accela Citizen Access (ACA) portal, and its list of ACA work types includes windows, doors and shutters and roof and reroof. Permits already open in the older BCLA system, whose numbers begin with "B", are still handled by email with the Building Division. Contractors have to register in the ACA portal before they can be tied to a permit.
| Project | Permit route | What the city asks for |
|---|---|---|
| Windows and exterior doors | Building permit for installation, replacement or major repair; filed in the ACA portal as windows, doors and shutters | Current Miami-Dade NOA or Florida Product Approval for each product, with the elements that apply circled or clouded, and a floor plan that numbers each opening to match a window and door schedule |
| Hurricane shutters | Building permit; same ACA work type | A Broward County uniform permit application, product approvals, a plan showing the location, size and type of each product, and an association approval letter for condos and HOAs |
| Garage doors | Building permit | Product approval; garage doors are on the city's list of products that need one |
| Reroof | Roof and reroof permit in the ACA portal | The HVHZ permit application for roofs, with product approvals for the roof system |
| Buildings with a mean roof height over 30 feet | The same permits | Site-specific design wind loads for components and cladding, signed and sealed by a design professional |
| Screen enclosure replaced with impact windows and doors | Treated as an addition | The requirements of an addition, because the work creates new living space |
What a homeowner should do is check, not file. The city's Building Permit Self-Service lets you search by address, owner name, neighborhood, contractor, permit number or folio number, see inspection results and confirm the status of a job. The FAQ adds that the official permit card and its attached documents must be available outside the property during inspections. If you need a permit's status verified for a legal purpose, such as a sale, the city asks you to call the Building Division at 954-921-3335.
- Hire a licensed contractor. Ask for the license number and confirm that the quote names each product and its approval.
- Watch for the permit. Look up your address on the city's self-service site and confirm the permit was issued before work starts.
- Keep the permit card posted. Inspectors need it, with its attached documents, accessible from outside.
- Follow the inspections. The self-service site shows each inspection and its result.
- Get the final. A permit with a passed final inspection is the record insurers and inspectors trust.
- Download your copies. Save the permit, the approvals and the inspection history in your house file.
Historic districts and enclosures
Two situations add steps. Exterior changes to a designated historic property, or to a house in one of the city's historic districts such as the Hollywood Lakes Historic District, can require a Certificate of Appropriateness through the Historic Preservation Board's review before the permit. And the city's FAQ says that replacing a screen enclosure with impact windows and doors creates new living space, so it is treated as an addition with an addition's requirements, not as a simple window job.
Finding old permits
The FAQ notes that permits issued on a property from 1988 onward can be reviewed on the city's website. For older work, or for a record that does not appear, ask the Building Division. A missing permit for a past reroof or window job is one of the most common reasons an item on the form comes back unknown.

Condos, townhomes and HOAs: hurricane protection under the board's rules
Condo owners in Hollywood live under a specific state rule. Section 718.113(5) of the Florida Statutes requires the board of every residential and mixed-use condominium to adopt hurricane protection specifications for each building, regardless of when the condominium was created. The specifications can address color, style and other factors, and they must comply with the applicable building code. The statute also says that installing, maintaining, repairing, replacing or operating hurricane protection under that subsection is not a material alteration or substantial addition, which keeps it out of the voting rules that would otherwise apply to changes of that kind.
The same subsection sets the limits on both sides. With the approval of a majority of the voting interests, the board may install hurricane protection or require owners to install it, and the vote must be recorded in the county's public records through a certificate. Where an owner wants to install protection that conforms to the board's specifications, the board may not refuse to approve it, although it can require the work to follow an existing unified building scheme for appearance. And when code-compliant protection is already in place, the board generally cannot require the same type again unless the existing protection has reached the end of its useful life or is needed to prevent damage to the common elements or a unit.
For a Hollywood unit owner, the practical order is short. Get the specifications and the declaration first, because the declaration usually decides who maintains and replaces windows and sliding doors. Then get the association's written approval, which the city's shutter checklist asks for on condo and HOA properties. In a tower, expect the engineering the city requires above 30 feet of mean roof height, and check the missile rating on upper-floor products. Townhome and villa communities usually have an HOA architectural approval instead of condo specifications, but the city still asks for the association's letter.
On the insurance side, most of the form describes the building, not the unit. Our guide to insurance inspections for condo HO-6 policies explains what a unit owner can document, and a condo unit inspection covers the condition of the windows, sliders and everything else inside your walls.

Keeping documents: the file that turns upgrades into form answers
Every attribute marked on items 2 through 9 of the form needs a photo or a document behind it. For upgrades, the documents usually matter more than the photos, because the things that earn credit, such as a sealed deck or the nail pattern on the deck, are hidden the day the job ends. Start a folder, paper or digital, before the first contractor arrives.
| Upgrade | Keep | Item it supports |
|---|---|---|
| Impact windows and doors | Permit with final inspection, approval for each product, invoice listing the openings, photos of the labels | 9 |
| Shutters | Permit, approval, invoice, photos of each label, a list of which panel fits which opening | 9 |
| Garage door | Permit, approval, installation drawing, photo of the label on the track or panel | 9 |
| New roof covering | Roof permit with final inspection, product approval, contract with the completion date | 4 |
| Sealed roof deck | Contract or roofer's letter naming the underlayment method and product, photos of the membrane going down | 8 |
| Deck renailing | Roofer's written nail type and spacing, photos of the nailing with a tape measure | 5 |
| Roof-to-wall connectors | Connector name and tested capacity, installation instructions, site-specific documentation, permit | 6 |
| FORTIFIED designation | The FORTIFIED Home Roof, Silver or Gold certificate | 4 to 6 and 8 to 9 |
A few habits make the file stronger. Ask each contractor to name the products and approval numbers on the invoice, not only on the permit application. Take your own dated photos during the work, especially of the bare deck, the underlayment going down and any connectors at the walls. Photograph each window label before a cleaning crew or a painter gets to it. And keep your previous wind mitigation report, because it shows which items were unknown last time and why.
When to book a new wind mitigation inspection after upgrades
The form is valid for up to five years only while no material changes are made to the structure and nothing on it is inaccurate. New windows, new doors, shutters, a new garage door or a new roof all change the house the old report describes, which is why our guide to how long a wind mitigation report stays valid treats them as reasons to update it early. The right moment is after the final inspection, once the permit shows as closed, so that the report and the city's record agree.
If you are doing several projects in the same season, it can make sense to finish them all and document the house once. If the projects are years apart, document each one when it is done, since the credit can only start once your insurer has the new form. Send the report to your agent and ask from what date the insurer will apply the new answers, then check the next declarations page to see that it did. Buying a house with recent upgrades works the same way: ask the seller for the permits and approvals, and our article on who benefits from a wind mitigation inspection in Hollywood explains why a buyer's report is worth ordering before insurance is bound. If you are still lining up your inspections for a purchase, our guide to choosing a home inspector in Hollywood covers the questions to ask before you book.
When you are ready, we do the wind mitigation inspection on Hollywood homes from our office on N 65th Ave, usually with the signed form the same day. Bring the folder, clear the attic hatch and leave the labels on the glass, and the new answers will have the proof they need.

My Safe Florida Home, city programs and asking your insurer first
Hurricane upgrades are expensive, so it is worth knowing where help has come from. The state's My Safe Florida Home program has offered free wind mitigation inspections and grants of up to $10,000 toward approved improvements such as impact windows and doors, garage door upgrades, roof-to-wall connections and secondary water barriers. Funding and application windows open and close, and the program has its own order of steps, so check mysafeflhome.com for the current status before you sign a contract. Our plain guide to the My Safe Florida Home grants explains how it works. We are an independent inspection company and are not part of that program.
Closer to home, the City of Hollywood's community development staff have run owner-occupied housing rehabilitation programs for income-qualified homeowners, and the improvements they have listed include roof replacement and impact windows and doors. Eligibility depends on household income and, for some programs, on the neighborhood, and funding comes in rounds, so ask the city what is open now.
Whatever the funding, ask your insurance agent one question before you commit: how would your premium change if a specific answer on your form improved? Insurers price combinations of answers differently, and a house with toe nails and unprotected glass may gain more from one upgrade than from another. That conversation costs nothing and keeps you from paying for work your policy will not notice.
After a hurricane: repairs, damaged openings and the Z answer
A storm can undo part of the work. The 2026 form added a new opening protection answer, Z, for openings that are damaged and in need of repair or replacement, and it states that homes with openings that need replacement do not qualify for wind mitigation rate differentials. A cracked impact pane, a slider pulled off its track or a garage door bent by the wind can therefore matter far beyond that one opening.
After a storm passes, walk the house: every window and door, the garage door, the shutter tracks and anchors, the roof edges you can see from the ground and the ceilings below the attic. Photograph damage before anything is moved, report it to your insurer, and have repairs done by a licensed contractor, under permit where the city requires one, since the major repair of a window or door is on its permit list. Our guide to checking a home after a hurricane covers the full walk, inside and out. Once the repairs are final, update the wind mitigation report so it shows the house as it stands.
Wind mitigation upgrade myths Hollywood homeowners run into
- "New impact windows on the front of the house will lower my premium." The form grades the weakest glazed opening. Until the last one is protected, the answer does not move.
- "Any shutter sold in Florida works in Hollywood." Products here need an approval that covers HVHZ use, and the city asks for it with the permit.
- "My roofer added straps, so item 6 is better now." Only if the qualifying connection reaches every truss the form counts and the work is documented.
- "The condo board can block my impact windows." A board may not refuse an installation that conforms to its hurricane protection specifications, though it can require a uniform appearance.
- "A permit is just paperwork." The permit and its final inspection are often the only proof of a sealed deck or a window's approval when the inspector arrives.
- "The new roof updates my wind report automatically." Your insurer keeps the old report on file until you send a new one.
Hurricane upgrades beyond Hollywood
Everything in this guide about HVHZ approvals applies across Broward and Miami-Dade, from Fort Lauderdale to Miami. Permits are handled city by city, or by the county in unincorporated areas, each with its own portal, checklists and record search, so the steps differ even where the code is the same. Palm Beach County sits outside the HVHZ, which changes the products and the region answer on the form. For the full picture of the services we offer in our home city, see our page on home inspections in Hollywood. For other cities, the local pages below explain what is typical there.
Wind mitigation inspections near you
The bottom line
Wind mitigation in Hollywood, FL works best as a plan rather than a purchase. Protect every glazed opening, starting with the gaps your house actually has, save the deck, the water barrier and the roof-to-wall work for a reroof you plan around the form, and buy products whose approvals cover HVHZ use. Let a licensed contractor pull the City of Hollywood permit, follow it to a passed final, keep the approvals and invoices together, and then put the work on a new form. If you want to know where your house stands before you spend, or need the upgrades documented afterward, call or text (954) 297-0317 or request a quote online. You will have a firm price before anything is scheduled, and you can read more about our wind mitigation inspections across South Florida.
Sources
- Section 718.113, Florida Statutes: maintenance, limitation upon improvement, hurricane protection
- City of Hollywood: Building Division frequently asked questions
- City of Hollywood: window and door replacement checklist
- City of Hollywood: hurricane shutters checklist
- City of Hollywood: Building Permit Self-Service
- Uniform Mitigation Verification Inspection Form, OIR-B1-1802 (Rev. 04/26), Rule 69O-170.0155, Florida Administrative Code
- U.S. Census Bureau, American Community Survey 2020–2024: median year structure built, Hollywood city, Florida
- My Safe Florida Home program
Laws, insurer rules and state programs change. This guide reflects these sources as of November 6, 2026.

