Wind mitigation · Reading your report

Wind Mitigation Report: How to Read Yours, Page by Page (2026)

A plain-English guide to the wind mitigation report itself: what each of the six pages shows, what the answer letters mean, how to check the photos and signatures, where to find a lost report, how to fix an error and when to replace it.

  • Updated
  • 26 min read
  • Based on form OIR-B1-1802 (Rev. 04/26) and Section 627.711, F.S.
Homeowner on the front porch of a South Florida home flipping through a printed wind mitigation report with inspection photos

The short answer

A wind mitigation report is the signed copy of Florida's Uniform Mitigation Verification Inspection Form, OIR-B1-1802, plus the photos and documents that prove each answer. On the 2026 version the form runs six pages: owner and policy details, nine lettered questions about the roof, the attic connections and the openings, then the inspector's credentials and both signatures. Your insurer reads those letters to decide which windstorm credits apply, so reading them yourself shows what was documented and what was not.

Key points

  • The state form is six pages long. Photo pages and supporting documents come after it, so the PDF you receive is longer.
  • The letters are not grades. On opening protection, A is the strongest answer. On roof deck and roof-to-wall attachment, A is the weakest one listed.
  • "Unknown", "no attic access", "no information" and level N mean the feature was not proven, which leaves your insurer nothing to credit.
  • A lost report can often be recovered from your agent, your insurer, the inspection company or the seller.
  • Only the inspector who signed it can correct it. Never edit the PDF yourself.
In this article 16 sections
  1. What is a wind mitigation report?
  2. What does a wind mitigation report look like?
  3. The wind mitigation report, page by page
  4. What each answer means in plain English
  5. The numbers and sub-boxes you can check yourself
  6. What "unknown", "not verified" and "no attic access" mean
  7. The photos and documents attached to the report
  8. Signatures, licenses and initials: what makes the report valid
  9. What to check before you send it to your agent
  10. How to send your wind mitigation report to your insurance agent
  11. Where can I find my wind mitigation report?
  12. How to correct an error on a wind mitigation report
  13. How long a wind mitigation report is valid, and when to replace it
  14. Reading a report from Broward, Miami-Dade or Palm Beach
  15. Six common misreadings of a wind mitigation report
  16. The bottom line

What is a wind mitigation report?

A wind mitigation report is the finished paperwork from a wind mitigation inspection. At its core is one state document, the Uniform Mitigation Verification Inspection Form (OIR-B1-1802), completed and signed by a qualified inspector, with photographs and documents attached behind it to support every answer. People also call it a windstorm mitigation report, a wind mit, or simply a mitigation report. They all mean the same thing in Florida: a written record of the wind-resistant features your house can prove it has.

The reason every report in the state looks alike is Section 627.711 of the Florida Statutes. That law created a single uniform form and requires insurers to accept it when one of the qualified people it lists has signed it. So whichever company did your inspection, the questions, the answer choices and the fine print were written by the state. An inspection company may add a cover page or fill the form in with its own software, but it cannot change what the form asks.

This guide is about the document after it lands in your inbox: what each page holds, what the letters mean in everyday words, which numbers you can check yourself, and what to do with the file next. If you want to know what happens during the visit itself, read our guide to how the inspection works first.

What does a wind mitigation report look like?

Open a current report and every page has the same frame. Across the top: the title, "Uniform Mitigation Verification Inspection Form", and a line telling you to keep a copy of the form and any documentation with your insurance policy. Across the bottom: a blank for the inspector's initials, a blank for the property address, the reminder that the form is valid for up to five years if no material changes are made to the structure and no inaccuracies are found, the warning that some items may not qualify for a discount, and the form number with its revision date and page count.

The state form is six pages on the version adopted for 2026. The evidence follows it. The form says any documentation used to validate a feature must accompany it, and it asks for at least one photograph or document for each attribute marked in questions 2 through 9. A complete report is therefore the six form pages, several pages of photos, and sometimes permit printouts, product approval sheets or a FORTIFIED certificate.

Most reports arrive as one PDF, and a paper copy works the same way. What your insurer cares about is that the form, the photos and the signatures travel together and clearly describe the same house.

How to tell which version you have

Look at the footer. "OIR-B1-1802 (Rev. 04/26)" is the current form, required for inspections conducted on or after April 1, 2026. "Rev. 01/12" is the previous version, which numbered seven questions instead of nine. Any report on a revision older than 01/12 is well past the five-year window and will not help you today.

Six printed pages of a wind mitigation inspection form laid out on a kitchen table, with photo pages, a pen and reading glasses
Fig. 01The state form runs six pages. The photo pages behind it carry the proof for each answer.

The wind mitigation report, page by page

The six pages always run in the same order. Inspection software can push a page break a few lines up or down, but the content and its sequence never change. Here is what each page holds and the one or two things worth checking on it.

Page01

The job details and the first four questions

The top block identifies the inspection: date, owner name, a contact person, street address, city, zip and county, home, work and cell phone, email, insurance company, policy number, the year the home was built and its number of stories. Below that sits a note explaining the proof rules, with three checkboxes for a FORTIFIED Home Roof, Silver or Gold certificate. Then come item 1 (building code, with the year built and the permit application date), item 2 (region), item 3 (roof slope) and table 4.1, which lists each roof covering on the house.

On this page
Owner and policy block, items 1, 2, 3 and 4.1
Check
Spelling of your name, the address, the insurer and the policy number

Page02

The roof covering answer and the deck

Page 2 opens with 4.2, a single answer that sums up every covering listed on page 1. Item 5, roof deck attachment, follows with its options from A to H, each one spelling out nail size, nail spacing or an uplift value. Item 6, roof-to-wall attachment, begins near the bottom with the toe-nail answer and the minimum conditions a metal connector has to meet before it can count as anything better.

On this page
Items 4.2, 5 and the start of 6
Check
One box per item, and a deck answer that matches the nailing photo

Page03

Straps, roof shape and the water barrier

The rest of item 6 lists clips, single wraps, double wraps and structural connections, then other, unknown, no attic access and "connection(s) not installed as intended". Item 7 records the roof shape with two measurements written in feet. Item 8 records whether there is a sealed roof deck and which of four accepted methods was found. The page usually closes with the first lines of item 9.

On this page
The end of item 6, items 7 and 8
Check
The two numbers on item 7, and which method is ticked if item 8 reads A

Page04

The opening protection chart

This is the grid most homeowners find confusing. Its columns are types of openings: windows or entry doors with glass, garage doors with glass, skylights and glass block, then entry doors and garage doors without glass. Its rows are protection levels: N/A, A, B, C, D, N, X and Z. The inspector puts an X in every row that applies to each column, so one column can carry several marks. Under the grid come answer A, the top level of protection on this form, with its three sub-answers, and the start of answer B.

On this page
The level chart and answers A and B of item 9
Check
Every opening type you have is marked, and N/A appears only for types you do not have

Page05

The rest of item 9 and the inspector's credentials

The rest of answer B, then answers C, N, X and Z, complete item 9. Then a heading in capitals states that mitigation inspections must be certified by a qualified inspector, followed by the inspector's name, license type, license or certificate number, company and phone, and six checkboxes naming the categories of people allowed to sign under Section 627.711(2).

On this page
Item 9 answers B to Z, inspector identity and qualification
Check
A license type and number are filled in, and the box ticked fits that license

Page06

Signatures and fine print

The last page carries the inspector's statement that he or she personally performed the inspection (licensed contractors and professional engineers may instead name a direct employee who did), the inspector's signature and date, and the homeowner's certification that the inspection took place and that identification was shown. Two legal warnings and a short disclaimer about the form's definitions close the document.

On this page
Inspector certification, homeowner certification, warnings
Check
Both signatures and both dates are present
Inspector crouching on a clay-colored barrel tile roof in Hollywood, Florida, reaching down to check the tiles near the edge
Fig. 02The roof covering rows on page 1 start on the roof itself, with photos of every covering type on the house.

What each answer means in plain English

The form speaks in letters, and those letters do not behave like report card grades. On item 9, A is the strongest protection the form recognizes. On item 5, A is the lightest nailing pattern listed and C is the strongest wood deck answer. On item 6, A stands for toe nails, the weakest connection on the list. Always read a letter against its own question, never against a letter on another line.

Wind mitigation report answers in plain English (form OIR-B1-1802, Rev. 04/26)
ItemAnswersWhat they mean
1 Building CodeA, B, C, DA: permit applied for under the FBC 2001 or 2004. B: under the FBC 2007 or later. C: HVHZ only, under the 1994 South Florida Building Code. D: unknown, or the permit date misses the cutoff for the year built.
2 RegionHVHZ, Region 1, 2, 3The wind zone at the address: HVHZ in Broward and Miami-Dade; elsewhere Region 1 (140 mph or more), Region 2 (130 to 139 mph) or Region 3 (below 130 mph).
3 Roof Slope6:12 or steeper, less than 6:12Whether the main roof rises at least 6 inches per foot of run, judged on the slope covering at least two-thirds of the main roof.
4.1 Roof Covering TypeOne row per coveringEach covering in use, with its permit application date or product approval number plus the year installed, or a tick for no information.
4.2 Product ApprovalA, B, C, DA: every covering meets the FBC (approval, roofing permit on or after 3/1/2002, or an original roof on a 2004 or newer home). B: every covering has a Miami-Dade approval, an HVHZ permit after 9/1/1994 and before 3/1/2002, or is an original roof from 1997 or later. C: at least one covering falls short. D: none qualify.
5 Roof Deck AttachmentA to HA: staples or 6d nails, 6 in. at edges and 12 in. in the field (at least 55 psf). B: 8d nails, 12 in. in the field (103 psf). C: 8d nails, 6 in. in the field, or board decking (182 psf). D: concrete deck. E: qualifying spray foam (110 psf). F: other. G: unknown. H: no attic access.
6 Roof to Wall AttachmentA to IA: toe nails, or connectors that miss the minimum conditions. B: clips. C: single wraps. D: double wraps. E: structural (anchor bolts or a concrete roof). F: other. G: unknown. H: no attic access. I: connections not installed as intended.
7 Roof GeometryA, B, CA: hip, with non-hip features no more than 10% of the roof perimeter. B: flat roof on a building with five or more units. C: any other shape.
8 Sealed Roof Deck / SWRA, B, CA: a sealed roof deck using one of four listed methods. B: no sealed roof deck. C: unknown or undetermined.
9 Opening ProtectionA, B, C, N, X, ZA: every glazed opening rated for the 9-lb large missile (4.5 lb for skylights). B: rated for the 4 to 8-lb missile. C: plywood or OSB panels per the FBC 2007 table. N: products that look rated but are unverified, or unidentified coverings. X: at least one glazed opening without protection. Z: one or more damaged openings.
9 Suffix.1, .2, .3Doors and garage doors without glass: .1 at the glass level or better, .2 at least one verified for wind pressure only, .3 at least one weaker, unprotected or damaged.

Two reading habits help. First, when you see "Other", look for the note written beside it: it means the inspector found something real that does not fit a listed answer. The deck question even tells inspectors to choose Other when nails or framing are spaced wider than the listed patterns. Second, look at the last few options on each item: unknown, undetermined, no attic access. Those do not describe your house. They describe what could not be proven on the day.

Which answers usually carry more weight?

The state does not hand homeowners a ranking, and every insurer prices combinations of answers through its own filed rates. Still, the form shows which direction is stronger. On item 5, the uplift values written into the answers climb from at least 55 psf for A, to 103 psf for B, to 182 psf for C. On item 6, the tested capacities for purpose-made connectors climb from 386 pounds for clips, to 535 for single wraps, to 891 for double wraps, while a documented 185 pounds only reaches the toe-nail category.

Item 9 goes further and names the rating group each answer feeds. The form ties A and B to "Hurricane" in the factor table, C to "Plywood or OSB" and N to "Ordinary" in the secondary factors table, and X to "None". Section 627.0629 asks insurers to recognize features that reduce windstorm losses, and these notes show how the form hands that information over. The weakest position of all is anything unproven. If you want to know which of your own answers moves your premium most, ask your agent to price a change on your actual policy.

The numbers and sub-boxes you can check yourself

Several items include measurements or secondary boxes that let you test the inspector's work. You need no training to read them, just a calculator and a few minutes.

Item 7: the hip roof math

When item 7 is marked A (hip roof), the form shows two figures in feet: the total length of non-hip features and the total roof system perimeter. Divide the first by the second. A result of 0.10 or less fits the form's definition of hip. Porch and carport roofs attached only to the fascia or wall over open space are excluded from both figures, so do not add them back in. If your house was marked C and you expected a hip answer, ask what the two measurements were.

Item 4: one row per roof covering

Table 4.1 should have a checked row for every covering on the house, including small sections such as a flat roof over a back room or a metal roof on an addition. Each row needs a permit application date or a product approval number together with the installation year, or a tick in "No Information Provided for Compliance". Answer 4.2 has to agree with those rows: if even one covering lacks support, 4.2 cannot be A or B for the whole house.

Item 6: the minimum-condition boxes

Before a connector can count as a clip, a single wrap or a double wrap, the form makes the inspector tick one of three qualifying conditions: a connector nailed to the truss with at least three nails, attached to the top plate or embedded in the bond beam, with less than a half-inch gap and no visible severe corrosion, a single strap wrapped over the truss with three nails on each side, or a purpose-made connector installed to the manufacturer's specifications. A clip or wrap answer with none of these boxes ticked is worth asking about.

Item 9: the number after the letter

An answer such as A.2 or N.3 has two parts. The letter describes the weakest protection found on any opening with glass. The number describes the doors and garage doors with no glass:

  • .1: every solid door is protected at least as well as the glass, or there are no solid doors.
  • .2: at least one solid door is verified for wind pressure only (level D in the chart), and none of the others falls below the glass level.
  • .3: at least one solid door is weaker than the glass protection, unprotected or damaged.

The suffix matters most on houses with excellent windows. Impact glass all around paired with an old, unrated garage door does not read A.1, and your insurer can rate that difference.

Item 8: which method was found

An A on item 8 should come with one of four methods ticked: a fully adhered membrane meeting ASTM D1970, taped deck seams under felt or synthetic underlayment, a double layer of listed underlayment, or spray foam. For spray foam, a separate box shows whether the entire underside of the deck is covered.

Inspector walking along the front of a stucco home in Hollywood, Florida, pulling out a tape measure past a dark-framed window
Fig. 03Measurements taken around the house become the two figures on item 7, which you can check yourself with a calculator.

What "unknown", "not verified" and "no attic access" mean

Nearly every item has a way of saying "I could not prove it", and each uses slightly different words. Table 4.1 has "No Information Provided for Compliance". Items 5 and 6 have "Unknown or unidentified" and "No attic access". Item 8 has "Unknown or undetermined". Item 9 has level N, for products that appear rated but are not verified, or coverings that cannot be identified. Item 1 rolls it into answer D: unknown, or a permit date that misses the cutoff.

None of these says your house lacks the feature. They say the evidence was not available that day. Because an insurer can only credit what the form proves, an unproven strap earns what a missing strap earns. The encouraging part is that many of these answers can change without any construction at all:

  • No attic access on items 5 and 6 usually means the hatch was sealed, blocked, missing or unsafe to enter. Clearing a path, or having access added, and then booking a new inspection lets both items be documented.
  • Unknown on item 8 is typical of finished roofs, because the membrane under tile or shingles cannot be seen from outside. A re-roof permit or a roofer's contract that names the underlayment can settle it.
  • No information on a roof covering row means no permit date or approval number was found for that covering. Many city and county building departments can search permits by address.
  • Level N on item 9 means shutters, windows or doors that look like rated products had nothing behind them: no label, no permit, no approval. Installer invoices that list Florida Product Approval or Miami-Dade NOA numbers can fill that gap.
  • D on item 1 means the code could not be tied to a qualifying permit application date. A copy of the original building permit sometimes changes it. On a newly built home the permit record makes this item easy to confirm, one reason we often complete the form during the final inspection of a new home.

Take whatever you find to the inspector who signed the report and ask whether it supports a different answer. If it does, the fix is a reissued or new form, not an edit you make yourself.

Close-up of the corner of an impact window frame with a small white product label still attached to the glass
Fig. 04A label left on the glass, or an approval number on an invoice, is often what separates level A or B from level N.

The photos and documents attached to the report

The photo pages are the proof behind each box, and they get read. Citizens Property Insurance has told agents to confirm that the inspection is complete and every required photo is attached before a form is submitted, and the form itself warns that the insurer may ask more questions about the features it verifies. On the current form, items 2 through 9 each need at least one photo or document for every attribute marked. The 2012 form asked for photographs only, and only for its questions 3 through 7.

A useful photo shows the feature and the detail that proves it. This is what we attach for each item:

  • Item 2: the design wind speed lookup for the address.
  • Item 3: the pitch of the main roof, with the measurement visible.
  • Item 4: each roof covering type, plus the permit or product approval behind it.
  • Item 5: the underside of the deck along a truss, with a tape measure showing nail spacing.
  • Item 6: the weakest connection found, close enough to count the nails.
  • Item 7: the roof from angles that show its shape, supported by the measurements.
  • Item 8: taped seams or foam seen from the attic, or the roofing document naming the underlayment.
  • Item 9: each type of opening, the garage door included, with labels or approvals where they exist.

Look at your photos the way an underwriter would. Is it clearly your house? Does the strap pictured match the answer checked on item 6? Is there a tape measure in the nailing shot? If a photo is blurry or missing for something that was marked, ask for it before you send anything. And if you hold a FORTIFIED Home Roof, Silver or Gold certificate, the form lets it validate items 4 through 6 and 8 through 9, but only if the certificate type is ticked on page 1 and a photocopy is attached.

Galvanized metal strap rising from a concrete bond beam and wrapping over a wood roof truss in a Florida attic, nails visible
Fig. 05A clear photo of the weakest connection, close enough to count the nails, is what supports the answer on item 6.

Signatures, licenses and initials: what makes the report valid

A report is only as strong as its signature. Section 627.711(2) lists the people insurers have to accept: home inspectors licensed under Section 468.8314 who completed at least three hours of hurricane mitigation training approved by the Construction Industry Licensing Board and passed a proficiency exam, certified building code inspectors, licensed general, building or residential contractors, professional engineers, professional architects, and anyone else the insurer recognizes as qualified. On page 5, the signer ticks one of those categories and writes a license type and number.

Three details on the last two pages deserve a look:

  • Who was in your house. The signer must have inspected it personally. Only licensed contractors and professional engineers may send a direct employee, and then page 6 names that employee and the licensee accepts responsibility for the work.
  • Your own certification. You, or a representative you authorize, sign that the named inspector or employee did inspect the residence and showed identification. Sign it only if that is true.
  • The footer blanks. Each page has a line for the inspector's initials and the property address. Filled in, they tie every page to the same job.

You can confirm a Florida license on the Department of Business and Professional Regulation's license search, by name or by license number. If the license fields are blank, or the number does not match a real license, ask before you send the report to anyone.

The warnings at the bottom of page 6 have teeth. Under Section 627.711, a person who knowingly or through gross negligence provides a false or fraudulent form can be investigated by the state's insurance fraud unit, disciplined by a licensing agency or prosecuted, and knowingly presenting a false form to obtain a discount you are not entitled to is a first-degree misdemeanor. That is why an honest report says "unknown" when the proof is missing. The alternative is a box nobody can defend.

What to check before you send it to your agent

Five minutes with the PDF can save a round of back and forth. Citizens tells its agents that the inspector must complete every field on the form, and a missing field is easier to fix before submission than after. Before you forward your report, run through this list:

  • The footer reads OIR-B1-1802 (Rev. 04/26) if the inspection took place on or after April 1, 2026.
  • Owner name, property address, insurance company and policy number match your declarations page.
  • The year of home and number of stories match the property records.
  • Items 1 through 9 each have one answer, and item 9 carries its .1, .2 or .3 suffix when the letter is A, B, C or N.
  • Every roof covering on the house appears in table 4.1.
  • Both measurements on item 7 are filled in if the answer is hip.
  • There is a photo or document for each attribute marked in items 2 through 9.
  • The FORTIFIED box is ticked and a copy attached, if you have a certificate.
  • The inspector's name, license type, license number, signature and date are present.
  • The homeowner certification is signed and dated.

If something is wrong, ask the inspector for a corrected copy first. Sending a report you already know has an error only pushes the credit further away.

How to send your wind mitigation report to your insurance agent

The Office of Insurance Regulation's guidance is short: take the completed inspection form to your agent. The agent submits it, and the insurer decides which credits apply. A simple routine keeps it from stalling:

  1. Send the whole file. Email the complete PDF, form and photos together. Photos sent separately can get detached from the form in someone's inbox.
  2. Ask for a submission date. Ask the agent to confirm when the report went to the insurer, so you know when to follow up.
  3. Ask what was accepted. After the review, ask which credits were applied and whether any answer was questioned.
  4. Read the new paperwork. When credits change, the policy documents change too. Citizens, for example, issues a revised declarations page when new discounts are approved.
  5. File your copy. The form's own header tells you to keep it with your policy. Save the PDF where you will find it at renewal and when you prepare the house for listing.

Do not be surprised if the insurer checks the form. Section 627.711 lets an insurer require independent verification, at its own expense, by an inspector, an inspection company or a quality assurance provider before accepting a form. That is routine and says nothing bad about your house. If your agent or insurer refuses a form you believe is valid, the Office of Insurance Regulation sends consumers to the Department of Financial Services' Division of Consumer Services, at 1-877-693-5236 (1-877-MY-FL-CFO).

One more piece of the system you never see: under Rule 69O-170.0155, insurers pass the information from each form they receive to the Office of Insurance Regulation through its web portal, leaving out the insured's name, phone numbers and email. If you are buying a home and your insurer also wants a 4-point, here is how to line up both inspections before closing.

Homeowner's hands at a laptop on a screened patio table, attaching an inspection report to an email, with a printed copy beside it
Fig. 06Send the form and its photos together as one file, then keep a copy with your policy documents.

Where can I find my wind mitigation report?

Reports disappear for ordinary reasons: a changed email address, a new agent, a move. Before paying for a new inspection, find out whether the old one still exists and whether it is still usable.

Where to look for a lost wind mitigation report
Where to lookWhy they may have itWhat to ask for
Your insurance agentAgents submit the form to the insurer on your behalfA copy of the wind mitigation form and photos on file for your policy
Your insurance companyIt reviewed the form when it applied your creditsThe mitigation inspection in your policy file, through customer service or your online account
The inspection companyThe inspector who signed it prepared the fileA copy by property address and approximate inspection date
The seller or listing agentA seller may still have the report from their own policyA copy during your inspection period, then a check of its date and revision
Your email and downloadsMost reports are delivered as a PDFSearch for OIR-B1-1802, wind mitigation, uniform mitigation or the inspector's company name
My Safe Florida HomeIf your inspection was done through the state programContact the program through mysafeflhome.com

Start with whoever submitted it last. If your policy documents show wind or hurricane mitigation credits, a form was probably on file at some point, and your agent or insurer can usually tell you which inspection it came from. When you get the copy, check its date and revision before you rely on it.

Buying a house? Ask for the seller's report

A seller's report can help you collect insurance quotes during the inspection period. Request it through your real estate agent and look at the date and revision first. Whether your insurer will take a report ordered by the previous owner is its decision: the form describes the structure, but it also carries the old owner's name and policy number, and some insurers want a fresh one. If the roof, windows or structure changed after that date, plan on a new inspection.

When nobody has it

If the report cannot be found, is more than five years old or is on a version your insurer no longer takes, a new inspection is the clean answer. The permits, invoices and approvals you turned up while searching are still useful: they are exactly what turns unknowns into documented answers on the new form.

How to correct an error on a wind mitigation report

Errors fall into three groups, and each one has its own fix.

Clerical mistakes

A misspelled name, the wrong policy number, the wrong insurer, a typo in the address. Contact the inspector who signed the form and ask for a corrected copy. No answer changes, so a return visit is usually unnecessary.

An answer that new evidence could change

Suppose item 8 reads unknown and you later find the roofer's contract naming a fully adhered underlayment, or item 9 reads N and the shutter approvals turn up in a drawer. Send those documents to the inspector. If they support a different answer, the inspector can reissue the form or come back to photograph what is needed. The decision belongs to the person signing, because that signature is a legal statement.

A disagreement about what is there

If you believe a strap was misread or a perimeter miscounted, ask for the photos and measurements behind the answer and an explanation. If you still disagree, another qualified inspector can perform a separate inspection, and that new form stands on its own photos and signature.

What never to do

Do not change a box, a date or a name on the PDF, and do not ask an inspector to mark a feature the evidence does not show. A form altered after signing is no longer the inspector's form, and the misdemeanor in Section 627.711 applies to whoever knowingly submits a false one to get a discount.

How long a wind mitigation report is valid, and when to replace it

The footer on every page states the rule, and the Office of Insurance Regulation repeats it: up to five years, as long as no material changes are made to the structure and no inaccuracies are found on the form. Five years is a ceiling, not an entitlement. Your insurer still decides whether a particular report is acceptable.

Replace the report sooner if any of these apply:

  • You re-roofed. A new covering changes item 4, and a re-roof is often when items 5 and 8 change as well. Keep the permit and the product approval paperwork. If your insurer is really asking about the roof's age, see Florida's roof age rules for insurance or book a roof condition inspection.
  • You protected openings. New impact windows, doors, shutters or a rated garage door, especially when they complete protection on every opening. The state's My Safe Florida Home grant program has helped pay for upgrades like these when funding is open.
  • You changed the structure. Retrofit straps or connectors, or an addition that changes the roof shape.
  • An opening is damaged. The current form flags damaged openings as level Z, and it states that homes with openings needing replacement do not qualify for wind mitigation rate differentials.
  • The report is close to five years old at your next renewal.

If your report is on the 2012 form

Reports done before April 1, 2026 used Rev. 01/12. Citizens has said it will keep accepting that version if it was completed within five years before April 1, 2026 and the structure has not changed, and that the new form does not alter the credits it offers at this time. It also warned agents that submitting an older form can bring performance violations. Other insurers set their own policy, so ask your agent. Reading an old report next to a new one takes care, because the numbering and several letters moved:

Reading a 2012 report next to a 2026 report
What you are readingOn a Rev. 01/12 reportOn a Rev. 04/26 report
Number of questions79, with Region and Roof Slope added as items 2 and 3
Building code lettersItem 1: A = FBC, B = SFBC-94, C = unknownItem 1: A = FBC 2001/2004, B = FBC 2007 or later, C = SFBC-94, D = unknown
Roof coveringItem 2Item 4, pairing the permit date or approval number with the installation year
Roof deck lettersItem 3: E = other, F = unknown, G = no attic accessItem 5: E = spray foam, F = other, G = unknown, H = no attic access
Roof to wallItem 4, answers A to HItem 6, A to H plus I for connections not installed as intended
Roof geometryItem 5Item 7, same letters
Secondary water resistanceItem 6Item 8, same letters, with four listed methods for A
Opening protectionItem 7, A to XItem 9, adding Z for damaged openings
Proof requiredPhotographs for questions 3 to 7A photo or document for each attribute in items 2 to 9

The biggest trap is item 1. On a 2012 report, B meant the South Florida Building Code of 1994. On a 2026 report, B means the Florida Building Code 2007 or later, and SFBC-94 moved to C. On the deck question, G meant no attic access in 2012 and means unknown in 2026. If a letter seems to have changed between two reports, read the wording before assuming anything changed in the house.

Reading a report from Broward, Miami-Dade or Palm Beach

A few answers depend on the county, and knowing which ones keeps you from flagging something that is correct. The Florida Building Code applies the High-Velocity Hurricane Zone only to Broward and Miami-Dade, so item 2 on a report from either county reads HVHZ. Palm Beach County is outside that zone, so its reports show Region 1, 2 or 3 instead, taken from the design wind speed lookup for the specific address.

Two paths exist only inside the HVHZ. On item 1, answer C (the 1994 South Florida Building Code) is limited to HVHZ homes. On item 4.2, answer B includes HVHZ roofing permits applied for after September 1, 1994 and before March 1, 2002. A Palm Beach County report should not rely on either of those paths, although the other routes to a 4.2 B answer, such as a Miami-Dade product approval, apply anywhere. For a local example, our guide to typical answers on Boca Raton reports walks through them.

Near the coast, look harder at the photos than at the letters. The form's minimum conditions for clips and wraps include being free of visible severe corrosion, so strap photos from waterfront homes carry extra weight. If you own a condo, much of the form describes the building rather than your unit, so ask your agent which document your insurer wants before you order anything, and see what a condo unit inspection covers. Our local pages explain the service city by city, starting with wind mitigation inspections in Hollywood.

Six common misreadings of a wind mitigation report

  • "A is the best answer on every item." On items 5 and 6, A is the weakest listed option. Each letter only makes sense next to its own question.
  • "The report tells me my discount." The form contains no dollar figures. Your insurer converts the answers into credits through its own filed rates.
  • "Unknown means my house does not have it." It means the proof was not available that day. Documents or attic access often change it.
  • "The inspector can mark it if I describe it." Every attribute in items 2 to 9 needs a photo or a document. A homeowner's description is not proof.
  • "It is good until the five-year date, whatever happens." A material change or an inaccuracy ends it sooner, and your insurer can decline an older report.
  • "My 4-point already covers this." A 4-point inspection reports the age and condition of four systems so an insurer can decide on eligibility. It contains no wind mitigation answers. Our guide explains how a 4-point differs from wind mitigation.

The bottom line

A wind mitigation report is six pages of state form plus the photos that prove it, and once you know the layout it reads quickly: job details and the first items on page 1, the roof and attic on pages 2 and 3, openings on pages 4 and 5, signatures on page 6. Read each letter against its own question, treat "unknown" as a paperwork problem before a construction problem, and check the details before the PDF goes to your agent. If your report is lost, out of date, on the old form or no longer matches the house, Peter Lemos, a Certified Master Inspector® and InterNACHI Certified Wind Mitigation Inspector, can inspect and send a new signed form, usually the same day, anywhere in Broward, Miami-Dade or Palm Beach. Call or text (954) 297-0317 or send us a request for a firm price, and read more about our wind mitigation inspections.

Peter Lemos, Certified Master Inspector and owner of Global Home Inspectors

About the author

Peter Lemos, Certified Master Inspector®

Owner and lead inspector of Global Home Inspectors in Hollywood, FL. Peter holds InterNACHI certifications in wind mitigation, 4-point and mold inspection and has served Broward, Miami-Dade and Palm Beach counties since 2008, with more than 7,000 inspections completed.

Good questions

Wind Mitigation Report FAQs

Short answers to what homeowners ask once the report arrives. Still unsure? Call or text (954) 297-0317.

What does a wind mitigation report look like?

It is Florida's six-page Uniform Mitigation Verification Inspection Form, with checkboxes for nine items, followed by photo pages and any supporting documents. Every page shows the form number OIR-B1-1802, its revision date, and blanks for the inspector's initials and the property address.

Where can I find my wind mitigation report?

Ask your insurance agent first, then your insurer. The inspection company that signed it may also have a copy, and if you bought the home recently, the seller or listing agent may still have theirs. Searching your email for OIR-B1-1802 can also turn it up.

How do I know if my wind mitigation report is still valid?

Check the inspection date and the revision printed in the footer. The form can be used for up to five years if the structure has not materially changed and nothing on it is inaccurate. Inspections from April 1, 2026 onward must be on Rev. 04/26, and acceptance of older reports is up to your insurer.

What does unknown mean on a wind mitigation report?

The inspector could not prove that feature on the day, usually because paperwork, attic access or a product label was missing. Your insurer has nothing to credit for that item. Permits, approvals or better access can often turn it into a documented answer on a new or reissued form.

Who sends the wind mitigation report to my insurance company?

Usually your agent. Send the complete PDF, photos included, to your agent, who submits it to the insurer. If you deal with the insurer directly, ask how it wants to receive the form and the photos.

Can a wind mitigation report be corrected?

Yes, by the inspector who signed it. Clerical mistakes such as a wrong policy number can usually be fixed with a corrected copy. Changing an answer takes evidence, and sometimes a return visit. Never edit the form yourself.

Does the wind mitigation report show how much I will save?

No. The form has no dollar figures. It records construction features, and your insurer turns those answers into windstorm credits using its own filed rates. Your agent can tell you which items affected your premium.

Can I use the seller's wind mitigation report when I buy a house?

Sometimes. If it is recent, on a version your insurer accepts, and nothing about the house has changed since, ask your agent whether it can be used. Some insurers prefer a new inspection in the buyer's name.

Is a wind mitigation report the same as a 4-point inspection?

No. The wind mitigation report documents features that resist hurricane wind and can earn credits. A 4-point reports the age and condition of the roof, electrical, plumbing and HVAC so an insurer can decide whether to write an older home.

Why does my wind mitigation report say no attic access?

The inspector could not safely reach or see the underside of the roof, so the roof deck and the roof-to-wall connections could not be verified. Clearing or creating access and booking a new inspection lets both items be documented.

South Florida home with a pool and lanai lit at night

Free estimate

Get a New Wind Mitigation Report

Call or text for the fastest response. We answer seven days a week and can often inspect the same or next day.

Call or text(954) 297-0317 Emailglobalhomeinspectors@gmail.com
HoursMon – Sun · 5:00 AM – 10:00 PM
We speakEnglish · Português · Español

Inspection work order

Nº GHI-0000
Best way to reach you
Best time
Preferred language

Prefer to talk? Call or text (954) 297-0317. By sending, you agree to our Privacy Policy.